

Case Study
Nuclear
Sellafield Carbon Footprint Tool
A modelling tool which records and forecasts Sellafield's carbon dioxide emissions enabling them to understand and therefore modify their carbon footprint.
Case Study
Nuclear
A modelling tool which records and forecasts Sellafield's carbon dioxide emissions enabling them to understand and therefore modify their carbon footprint.
Case Study
Nuclear
Four linked control systems to facilitate waste removal from the Pile Fuel Cladding Silo at Sellafield, as part of their Early Retrievals project.
Case Study
Nuclear
Safety and Control Systems to monitor and control the active water in the aging storage facility.
Case Study
Nuclear
A replacement SCADA System, data acquisition, networking and communications infrastructure, integrated into the existing legacy plant, to ensure continued availability of the AIC.
Case Study
Nuclear
A complete control and safety system for the new Silo Maintenance Facility (SMF) at Sellafield.
Case Study
Nuclear
ITI developed a new Rod Drop Monitoring system using commercially-available off-the-shelf hardware and software.
Case Study
Oil & Gas
After just one year of collaborating with ITI on their Digital Transformation programme, Spirit Energy are already seeing the benefits of a properly managed data solution.
Case Study
Oil & Gas
Real-time Information System to Monitor Repsol Sinopec’s Rotating Equipment Excellence Programme
Case Study
Oil & Gas
Remote operation of the DP6 offshore gas platform to improve safety and minimise manned interventions.
Case Study
Oil & Gas
Integrated control and safety system on the newly developed Babbage platform
Case Study
Oil & Gas
Control and safety systems for three new compressors at Etzel to automate various processes in the compression, cooling and transmission of gas being stored in underground salt strata caverns.
Case Study
Oil & Gas
Upgrade of the obsolete safety equipment on the DPPA platform, completing a series of fire and gas system (FGS) and emergency shutdown (ESD) system upgrades on all the assets across Morecambe Bay.
Case Study
Hydroelectric
ITI undertook a full overhaul of the integrated electrical and control systems for Storr Lochs Hydroelectric Power Station on the Isle of Skye, creating a resilient, reliable and upgraded control solu...
Case Study
Hydrogen
ITI was contracted by a large manufacturer of hydrogen energy systems to supply a turnkey, safety rated containerised control system for a water electrolysis plant, to be installed within an explosive...
Case Study
Hydrogen
ITI has been awarded numerous contracts by a large manufacturer of hydrogen energy systems to design, supply and install control systems for various containerised water electrolysis plants located in...
Case Study
Manufacturing
ITI Group created a suite of simulation models to assess the performance of, and determine the optimal set up for, a new distribution centre.
Case Study
Manufacturing
A real-time Manufacturing Execution System (MES) platform that worked with WaterWipes'r existing machinery and enabled them to optimise their operations.
Loading...