Emergency Shutdown (ESD)

Keeping our energy production safe and sustainable

The hazardous operations of critical infrastructure require reliable technology, robust systems, and support you can count on.

We earn trust, by delivering enhanced protection

Our emergency shutdown systems are designed to minimise the consequences of emergency situations in hazardous environments such as a chemical release, fire, or explosion.

We design systems that are trusted to protect the largest, most complex operations in critical industry. Our systems protect onshore and offshore assets, and the people that work on them.

Read our case studies, and find out we deliver, and the difference we make.

More in Integrated Control and Safety Systems

A control panel with lights and keys.

Integrated Control and Safety Systems

Large white tanks.

Tank Overfill Protection (TOP)

A photograph of a control panel with different coloured buttons.

Fire & Gas Detection and Control (FGS)

An oil rig from the view of the coastline.

Remote Operations & Minimum Manning Solutions

Barrow terminal industrial site.

High Integrity Pressure Protection Systems (HIPPS)

View our Case Studies

EDF Energy logo.

EDF Hinkley B AIC SCADA Replacement

The Alternative Indication Centre (AIC) at Hinkley Point B Power Station provides a secondary, remote monitoring facility for post-trip-event reactor conditions, ensuring safe shutdown and maintenance of adequate post-trip cooling and providing a back-up to the Central Control Room.

Nuclear
Read Case Study
Sellafield logo.

Sellafield Carbon Footprint Tool

The recording and forecasting of carbon dioxide emissions (CO2e) is key to Sellafield’s ability to understand and modify their carbon footprint.

Nuclear
Read Case Study
Cadbury logo.

Cadbury’s New Chewing Gum Factory Development

ITI Group used simulation to help Cadbury overcome the typical challenges of planning and building a new factory; ensuring that the equipment selection, rules for operation, staffing levels and production capacity were all in sync with the business plan.

Manufacturing
Read Case Study
Marks and Spencer logo.

Marks & Spencer Distribution Centre: Simulation for Facility Design

ITI Group used simulation to help Marks and Spencer plc (M&S) design its 900,000sq ft distribution centre in Leicestershire.

Distribution & Logistics
Manufacturing
Read Case Study
SSE logo.

SSE Storr Lochs Hydroelectric Station Refurb

ITI undertook a full overhaul of the integrated electrical and control systems for Storr Lochs Hydroelectric Power Station on the Isle of Skye, creating a resilient, reliable and upgraded control solution for SSE (formerly Scottish & Southern Energy).

Energy
Read Case Study
Spirit Energy logo.

Spirit Energy Digital Transformation

After just one year of collaborating with ITI Group on their Digital Transformation programme, Spirit Energy are already seeing the benefits of a properly managed data solution.

Energy
Read Case Study
BP logo.

BP Nerefco Refinery Optimisation

A simulation study carried out by Saker Solutions (now ITI Group), in conjunction with BP, enabled Nerefco to optimise offsite facilities’ performance and identify savings worth millions of dollars over the life of the project.

Energy
Read Case Study

Repsol Sinopec Rotating Equipment

Through a collaborative approach, ITI helped Repsol Sinopec (previously Talisman Sinopec) achieve its ambitious “Rotating Equipment Excellence Programme”, which provides early warnings about potential equipment failures, collects and analyses historical data and enables future operational trends to

Energy
Read Case Study

Find Us

We have sites across the UK and North America

ITI Operations Limited

+44 (0) 1246 437600
[email protected]

Rotherside Road,
Sheffield,
South Yorkshire, S21 4HL

View on Google Maps

Get in Touch

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.