Tank Overfill Protection (TOP)

Protect personnel, the environment, and your business

Tank Overfill Protection (TOP) Systems are an absolute necessity for owners and operators in the oil and gas industry, where spillage is not only costly to remedy but puts health and safety of employees and the environment at risk.

Safety solutions

Our 40+ year history of supplying control and safety solutions to the oil and gas industry comes with a legacy of safeguarding operations and protecting the environment.

We can install accurate, robust and reliable systems compliant with the recommendations published following the Buncefield fire in 2005.

As well as automatically detecting overflow and leakage in order to raise alarms and keep you compliant, our Tank Overfill Protection (TOP) Systems can offer the added benefits of increased operational efficiency and higher tank utilisation.

More in Integrated Control and Safety Systems

A control panel with lights and keys.

Integrated Control and Safety Systems

A man in a control room on his laptop.

Emergency Shutdown (ESD)

Fire and gas panel with blue and red buttons.

Fire & Gas Detection and Control (FGS)

An oil rig from the view of the coastline.

Remote Operations & Minimum Manning Solutions

Barrow terminal industrial site.

High Integrity Pressure Protection Systems (HIPPS)

View our Case Studies

EDF Energy logo.

EDF Hinkley B AIC SCADA Replacement

The Alternative Indication Centre (AIC) at Hinkley Point B Power Station provides a secondary, remote monitoring facility for post-trip-event reactor conditions, ensuring safe shutdown and maintenance of adequate post-trip cooling and providing a back-up to the Central Control Room.

Nuclear
Read Case Study
Sellafield logo.

Sellafield Carbon Footprint Tool

The recording and forecasting of carbon dioxide emissions (CO2e) is key to Sellafield’s ability to understand and modify their carbon footprint.

Nuclear
Read Case Study
Cadbury logo.

Cadbury’s New Chewing Gum Factory Development

ITI Group used simulation to help Cadbury overcome the typical challenges of planning and building a new factory; ensuring that the equipment selection, rules for operation, staffing levels and production capacity were all in sync with the business plan.

Manufacturing
Read Case Study
Marks and Spencer logo.

Marks & Spencer Distribution Centre: Simulation for Facility Design

ITI Group used simulation to help Marks and Spencer plc (M&S) design its 900,000sq ft distribution centre in Leicestershire.

Distribution & Logistics
Manufacturing
Read Case Study
SSE logo.

SSE Storr Lochs Hydroelectric Station Refurb

ITI undertook a full overhaul of the integrated electrical and control systems for Storr Lochs Hydroelectric Power Station on the Isle of Skye, creating a resilient, reliable and upgraded control solution for SSE (formerly Scottish & Southern Energy).

Energy
Read Case Study
Spirit Energy logo.

Spirit Energy Digital Transformation

After just one year of collaborating with ITI Group on their Digital Transformation programme, Spirit Energy are already seeing the benefits of a properly managed data solution.

Energy
Read Case Study
BP logo.

BP Nerefco Refinery Optimisation

A simulation study carried out by Saker Solutions (now ITI Group), in conjunction with BP, enabled Nerefco to optimise offsite facilities’ performance and identify savings worth millions of dollars over the life of the project.

Energy
Read Case Study

Repsol Sinopec Rotating Equipment

Through a collaborative approach, ITI helped Repsol Sinopec (previously Talisman Sinopec) achieve its ambitious “Rotating Equipment Excellence Programme”, which provides early warnings about potential equipment failures, collects and analyses historical data and enables future operational trends to

Energy
Read Case Study

Find Us

We have sites across the UK and North America

ITI Operations Limited

+44 (0) 1246 437600
[email protected]

Rotherside Road,
Sheffield,
South Yorkshire, S21 4HL

View on Google Maps

Get in Touch

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.